Túnel de O Cañizo V.I. (España)

Project: O Cañizo Tunnel V.I (Spain)

A 5,350 linear-meter tunnel and a 74 m2 excavation section for the new AVE line linking Madrid to Galicia. The geological profile of the tunnel distinguishes between a healthy granite zone of around 3,900 meters and a slate zone of around 1,450 meters. Excavation methods include drilling and blasting, both forward and burst, as well as mechanical excavation and shaving, depending on the site conditions.

Duration: 2013- 2014

Hours: 115,200 H

The Proequipe team :
15-22 (depending on the time of day) with different functions and specialties

Professional fields:
– Excavation of the tunnel with explosives using the advance and burst method.
– Execution of the tunnel’s interior structure for the duration of the work