
Project: Support work in the mechanical workshop of zinc plants. Preventive and corrective maintenance of all equipment involved in the zinc production process at AZSA.
Duration: 2019 – current
Hours: 40,000 h/year
The Proequipe team :
-Operation and maintenance of two tunnel boring machines.
-Electricians
– Tunnel boring machine drivers