Project: Prefabrication and assembly of the 80ºC tower’s inner lining.
Forming of 3 mm thick cladding sheet, A-304
Fastener assembly and welding; Tig welding.
Assembling and welding the sheets inside the tank using Tig welding.
Duration: 2018
Hours: 2,400 H
The Proequipe team :
– 1 Site foreman