Project: Overhaul work on units B2 and RB2 during planned shutdown
Prefabrication and assembly of 24,000″ of pipe by TIG welders and pipe fitters.
Assembly of 350Tn equipment and connection of pipes, corridors, structures, etc., using personnel specialized in equipment adjustment, structure assembly, welding, etc.
Duration: 2017
Hours: 6,000 H
The Proequipe team :
– Installation of the “BLOW TANK” tank in the pulp mill