Project: Bucharest metro line 5 (Romania)
This work includes the construction of 9 stations and two parallel tunnels, each 6,223 metres long, as well as a series of structures such as ventilation shafts and electrical substations.
Duration: 2014 – 2017
Hours: 19,500 H
The Proequipe team :
– Hoses
– 3 Welders
– 2 fitters
Professional fields:
Excavation is carried out using an EPB HK closed-shield TBM with a diameter of 660 cm.