Project: Repair of wood chip silo Nº2, replacement of silo roof ø 16m incl. support structure
Dismantling of existing structure and sheet metal.
Prefabrication, assembly and welding of the roof structure.
Installation of the silo roof enclosure sheet.
Duration: June 2018
Hours: 2,400h
The Proequipe team:
– 1 site manager.
– 2 safety technicians.
36 workers :
– 20% pipefitters
– 20% TIG welders
– The rest of the workers, the first fitters.
– 1 Construction Manager